BUILD-Program-Logo

BUILD Program Technical Assistance is available for low income all-electric building planning, project fuel-switching, and low-emissions building design and technologies.

Technical Assistance Application

For additional information, please see BUILD Program website.  General questions can be directed to build@energy.ca.gov.
Primary Contact Information





Please enter numbers only



Additional Project Contact

Additional Project Contact Information





Please enter numbers only



Based on the information you have entered so far, General/Non-Project Specific Technical Assistance will be requested.
Technical Assistance Request



Your BUILD Case ID starts with the letter "C" followed with 7 numbers. Do not enter any dashes or spaces. Example: C2200026
Development Territory
Based on the selection(s) made, your organization is not eligible for Technical Assistance through the BUILD Program.
Do you operate in any of the following gas utility territories?
  • Southern California Gas Company
  • Pacific Gas and Electric Company
  • San Diego Gas and Electric Company
  • Southwest Gas Corporation

Project Details




Use 2-letter state abbreviation, example - CA

Project Eligibility Details
Based on the selection(s) made, this project is not eligible for Technical Assistance through the BUILD Program.




Low Income Requirements
Only low income qualified projects are eligible for BUILD technical assistance.  Please select a low-income eligibility category that applies to your project. If more than one applies, you may select any applicable category.
New Building Requirement
New Construction - A new building being planned or in the design stage.
New Construction 50% or more - Any work, addition to, remodel, repair, renovation, or alteration of any building(s) or structure(s) when 50 percent or more of the exterior weightbearing walls are removed or demolished.
Adaptive Reuse - An existing building repurposed for housing, whose original use was not residential.




Unit Count (Anticipated)
Please enter the number of each unit type for the development. Where there are no units of that size, enter "0". 
Home Count (Anticipated)
Please enter the number of each home type for the development. Where there are no homes of that size, enter "0". 
Project Development Experience


Related Documents
Please provide fileshare links to download project documents, plans that you would like to share with the TA provider to expedite your project intake.



Limit 25MB per file

Related Organizations
Are any of the following organizations under contract for work related to the project for which you are applying?
  • Association for Energy Affordability
  • TRC Companies, Inc.
  • California Housing Partnership Corporation
  • Celery Design Collaborative
  • David Baker Architects
  • Mithun
  • Integral Engineers
  • SmithGroup
  • Highlands, Inc.
  • The Ortiz Group

Based on the selection(s) made, this project is not eligible for Technical Assistance through the BUILD Program.
Based on the selection(s) made, your organization is not eligible for Technical Assistance through the BUILD Program.
Thank you for your interest in Technical Assistance through the BUILD Program.  After you submit this form, the Technical Assistance Provider (TAP) will contact you with a Request for Intake Interview to discuss your project needs.

Application Review, and Confirmation

Please select "Review Application" button below to review your application responses, edit and print a copy for your records.

Program applicants will receive occasional program news and information via email and can opt out at any time.

IMPORTANT:  You must select the "Confirm" button at the bottom of the next screen to complete and submit your application for review.

Thank you for your interest in Technical Assistance through the BUILD Program. Based on your eligibility, the Technical Assistance Provider (TAP) will contact you with a Request for Intake Interview to discuss your project needs and create a Technical Assistance Service Summary.